Unstrut-Viaduct

VDE 8.2 New construction

  • Unstrut-Viaduct
    Unstrut Viaduct
  • Unstrut-Viaduct
    Unstrut Viaduct
  • Unstrut-Viaduct
    Unstrut Viaduct
  • Unstrut-Viaduct
    Unstrut Viaduct (construction progress)
  • Unstrut-Viaduct
    Unstrut Viaduct flooding January 2011
  • Unstrut-Viaduct
    Unstrut Viaduct
  • Unstrut-Viaduct
    Unstrut Viaduct

The completion of the 2668-metre-long bridge, which is joined by the Bibra Tunnel to the west and the Osterberg Tunnel to the east, is planned by the end of 2014.

 

Facts and figures:

  • Viaduct length: 2668 meters
  • Project duration: 2007 – 2014 (planned)
  • Project volume (total): 58 Million Euros (geplant)

 

Further information: DB Netz AG

Contact

Alexander Strutzke
Alexander Strutzke
Dipl.-Geogr.
Dipl.-Betriebswirt (FH)
Sales and Marketing Manager
phone: +49 (931) 35503-550

Successful Drawing Management with EPLASS:

After EPLASS Drawing Management and Document Management have already been successfully used in all other VDE 8 sub-projects, they are also being used in this bridge project. ARGE and its partners handle the entire drawing approval process via individual workflows from EPLASS Professional. The Federal Railway Authority is integrated into the approval process with an interface and a qualified digital signature

 

„… Every project participant can import an up-to-date drawing list and every document ( drawings, lists, inspection reports, ...) in standard office formats to the user PC at any time. The handling with EPLASS is easy to learn".

Lars Schneider

SMP - Ingenieure im Bauwesen GmbH,
Dresden / Executive planning.