Sandberg Tunnel
VDE 8.1 New Line
-
Sandberg Tunnel North Foto: Nürnberg Luftbild, Hajo Dietz -
Sandberg Tunnel South Foto: Nürnberg Luftbild, Hajo Dietz -
Sandberg Tunnel South Foto: DB AG -
Sandberg Tunnel South Foto: DB AG -
Sandberg Tunnel North Foto: DB AG
Facts and figures
- Tunnel length: 1.320 m
- Maximum depth below the surface: as in mining
- Construction method: 2002
More Information: DB Netz AG
Contact
Dipl.-Geogr.
Dipl.-Betriebswirt (FH)
Sales and Marketing Manager
phone: +49 (931) 35503-550
Successful project collaboration with EPLASS:
Since EPLASS is already being successfully used for all the single projects of the German Unity Project No.8, it will also be used for the project organization of this subproject.
To facilitate the complex construction management in a central system, the project participants decided to work with the internet based project collaboration platform EPLASS. All processes are easily accessible for all project participants at any time and any place. Everything from the correspondence, to the construction reports, structural analysis, check reports and claims are organized, reviewed and archived within EPLASS. The project participants consists of the above named joint venture, the German Railway (DB AG), external designers, checking engineers, geotechnical engineers and the building inspection. The federal railway authority is also involved in this project.
© 2023 EPLASS project collaboration GmbH
Contact | Legal Info | Terms of Contract | Privacy Statement
EPLASS Support | EPLASS Remote Support | EPLASS Meeting
Support-Hotline +44 (0)1452 260266