Eierberge Tunnel

  • Eierberge Tunnel
    The Eierberge Tunnel
  • Eierberge Tunnel
    The Eierberge Tunnel
  • Eierberge Tunnel
    The Eierberge Tunnel
  • Eierberge Tunnel
    The Eierberge Tunnel

The 3,756 metre Eierberge Tunnel is being built in the Eierberge ridge. The tunnel runs under the gently rising Eierberge. Around the two portals and where the dig-and-case method is used (Schmiedsgraben), the terrain is gently undulating.

 

Facts and figures:

  • Total length: 3.756 meter
  • Duration of the project: 2010 - 2013
  • Total project volume: 90 Mio. Euro (planned)

 

Contact

Alexander Strutzke
Alexander Strutzke
Dipl.-Geogr.
Dipl.-Betriebswirt (FH)
Sales and Marketing Manager
phone: +49 (931) 35503-550

Successful project collaboration with EPLASS:

Since EPLASS is already being successfully used for all the single projects of the German Unity Project No.8, it will also be used for the project organization of this subproject.

To facilitate the complex construction management in a central system, the project participants decided to work with the internet based project collaboration platform EPLASS. All processes are easily accessible for all project participants at any time and any place. Everything from the correspondence, to the construction reports, structural analysis, check reports and claims are organized, reviewed and archived within EPLASS. The project participants consists of the above named joint venture, the German Railway (DB AG), external designers, checking engineers, geotechnical engineers and the building inspection. The federal railway authority is also involved in this project.