Unstrut-Viaduct
VDE 8.2 New construction
-
Unstrut Viaduct Photo: Nürnberg Luftbild, Hajo Dietz -
Unstrut Viaduct Foto: DB AG/Klaus Heinrich -
Unstrut Viaduct Foto: DB AG/Frank Kniestedt -
Unstrut Viaduct (construction progress) Photo: DB AG -
Unstrut Viaduct flooding January 2011 Photo: Holger Althaus -
Unstrut Viaduct Foto: DB AG/Klaus Heinrich -
Unstrut Viaduct Foto: DB AG
The completion of the 2668-metre-long bridge, which is joined by the Bibra Tunnel to the west and the Osterberg Tunnel to the east, is planned by the end of 2014.
Facts and figures:
- Viaduct length: 2668 meters
- Project duration: 2007 – 2014 (planned)
- Project volume (total): 58 Million Euros (geplant)
Further information: DB Netz AG
Contact

Dipl.-Geogr.
Dipl.-Betriebswirt (FH)
Sales and Marketing Manager
phone: +49 (931) 35503-550
Successful Drawing Management with EPLASS:
After EPLASS Drawing Management and Document Management have already been successfully used in all other VDE 8 sub-projects, they are also being used in this bridge project. ARGE and its partners handle the entire drawing approval process via individual workflows from EPLASS Professional. The Federal Railway Authority is integrated into the approval process with an interface and a qualified digital signature
„… Every project participant can import an up-to-date drawing list and every document ( drawings, lists, inspection reports, ...) in standard office formats to the user PC at any time. The handling with EPLASS is easy to learn".
Lars Schneider
SMP - Ingenieure im Bauwesen GmbH,
Dresden / Executive planning.