Masserberg Tunnel
VDE 8.1 New Line
-
Masserberg Tunnel Foto: Nürnberg Luftbild, Hajo Dietz -
Masserberg Tunnel Foto: Nürnberg Luftbild, Hajo Dietz -
Masserberg Tunnel Foto: DB AG -
Masserberg Tunnel Foto: DB AG -
Masserberg Tunnel Foto: DB AG
The Masserberg Tunnel passes under Masserberg between kilometre points 52.853 and 53.904, a length of 1,051 metres. This tunnel also has a two-track tube with a maximum excavated cross-section of around 160 square metres. The tunnel tube created using mining methods has a length of 1,011 metres. The Masserberg Tunnel passes under undeveloped and primarily forested land, including a number of forest tracks and transport routes.
Facts and figures
- Tunnel length: 1.051 m
- Construction method: as in mining
More Information: DB Netz AG
Contact
Dipl.-Geogr.
Dipl.-Betriebswirt (FH)
Sales and Marketing Manager
phone: +49 (931) 35503-550
Successful project collaboration with EPLASS:
On this particular construction site over 250 people from different disciplines are employed. Furthermore, other designers, checking engineers, and geotechnical engineers are also involved in the project. By using EPLASS Professional all these project participants received access to all relevant documents.
By use of different workflows, both the preliminary as well as the construction phase processes, in addition to the structural analysis, are being reviewed digitally and approved for construction. Via a special interface, the federal railway authority is also involved in the project.
In addition to the design management via EPLASS Professional, the digital construction documentation is being archived within the EPLASS Correspondence document management system (DMS), and also the administration and review procedures of all claims are being processed within the EPLASS Claim Management module.