Fleckberg Tunnel

VDE 8.1 New Line

  • Fleckberg Tunnel
    Fleckberg Tunnel
  • Fleckberg Tunnel
    Fleckberg Tunnel
  • Fleckberg Tunnel
    Fleckberg Tunnel
  • Fleckberg Tunnel
    Fleckberg Tunnel
  • Fleckberg Tunnel
    Fleckberg Tunnel

 

 

Facts and figures

  • Tunnel length: 1.490 m
  • Construction method: as in mining

 

More Information: DB Netz AG

Contact

Alexander Strutzke
Alexander Strutzke
Dipl.-Geogr.
Dipl.-Betriebswirt (FH)
Sales and Marketing Manager
phone: +49 (931) 35503-550

Successful project collaboration with EPLASS:

On this particular construction site over 250 people from different disciplines are employed. Furthermore, other designers, checking engineers, and geotechnical engineers are also involved in the project. By using EPLASS Professional all these project participants received access to all relevant documents.

By use of different workflows, both the preliminary as well as the construction phase processes, in addition to the structural analysis, are being reviewed digitally and approved for construction. Via a special interface, the federal railway authority is also involved in the project.

In addition to the design management via EPLASS Professional, the digital construction documentation is being archived within the EPLASS Correspondence document management system (DMS), and also the administration and review procedures of all claims are being processed within the EPLASS Claim Management module.