Baumleite Tunnel

VDE 8.1 New Line

  • Baumleite Tunnel
    Baumleite Tunnel
  • Baumleite Tunnel
    Baumleite Tunnel
  • Baumleite Tunnel
    Baumleite Tunnel
  • Baumleite Tunnel
    Baumleite Tunnel
  • Baumleite Tunnel
    Baumleite Tunnel

The Baumleite Tunnel is located between the municipalities of Theuern, Truckenthal and Grümpen. Tunnelling began towards the south at the north portal. The excavated material is being taken from the north portal to the Galgenberg landfill next to the cutting at Theuern.

 

Facts and figures

  • Tunnel length: 1.317 m
  • Maximum depth below the surface: 30 m
  • Construction method: as in mining

 

More Information: DB Netz AG

Contact

Alexander Strutzke
Alexander Strutzke
Dipl.-Geogr.
Dipl.-Betriebswirt (FH)
Sales and Marketing Manager
phone: +49 (931) 35503-550

Successful project collaboration with EPLASS:

On this particular construction site over 250 people from different disciplines are employed. Furthermore, other designers, checking engineers, and geotechnical engineers are also involved in the project. By using EPLASS Professional all these project participants received access to all relevant documents.

By use of different workflows, both the preliminary as well as the construction phase processes, in addition to the structural analysis, are being reviewed digitally and approved for construction. Via a special interface, the federal railway authority is also involved in the project.

In addition to the design management via EPLASS Professional, the digital construction documentation is being archived within the EPLASS Correspondence document management system (DMS), and also the administration and review procedures of all claims are being processed within the EPLASS Claim Management module.