Schobse Viaduct

VDE 8.1 New Line

  • Schobse Viaduct
    Schobse Viaduct
  • Schobse Viaduct
    Schobse Viaduct
  • Schobse Viaduct
    Schobse Viaduct
  • Schobse Viaduct
    Schobse Viaduct
  • Schobse Viaduct
    Schobse Viaduct

The bridge, which is 87 metres long and 14.10 metres high, takes the line across the Schobse Valley 1.5 kilometres west of the municipality of Gehren. It crosses the valley at a maximum height of 10 metres. It is located between the Brandkopf Tunnel to the south and the Lohmeberg Tunnel to the north.

Facts and figures

  • Bridge length: 87 m
  • Width: 14,10 m
  • Construction depth: 1,5 m
  • Construction height: 2,425 m
  • Height above ground: 10 m
  • Structure type: prestressed solid plate, continuous girder

 

More Information: DB Netz AG

Contact

Alexander Strutzke
Alexander Strutzke
Dipl.-Geogr.
Dipl.-Betriebswirt (FH)
Sales and Marketing Manager
phone: +49 (931) 35503-550

Successful project collaboration with EPLASS:

Since EPLASS is already being successfully used for all the single projects of the German Unity Project No.8, it will also be used for the project organization of this subproject.

To facilitate the complex construction management in a central system, the project participants decided to work with the internet based project collaboration platform EPLASS. All processes are easily accessible for all project participants at any time and any place. Everything from the correspondence, to the construction reports, structural analysis, check reports and claims are organized, reviewed and archived within EPLASS. The project participants consists of the above named joint venture, the German Railway (DB AG), external designers, checking engineers, geotechnical engineers and the building inspection. The federal railway authority is also involved in this project.