The highway A5 between Karlsruhe and Switzerland with a daily traffic occurrence of approx. 70.000 vehicles is a major traffic artery of European importance.

The expansion of the A5 is implemented as a so-called A-model. Via Solutions Südwest plans, finances, builds, maintains and operates the A5 between Malsch and Offenburg for 30 years.

The consortium shareholders are VINCI Concessions (50%)”, “Meridiam Infrastructure (37.5%)” and “Kirchhoff (12.5%)”; who bring in long-standing experience and expertise in the area of transport infrastructure.

For the implementation of the construction work Via Solutions Südwest has assigned a Joint Venture consisting of „VINCI“-subsidiary „EUROVIA“, „Kirchhoff“ and „Reif Bauunternehmung“.

Overall 58 bridges are being newly constructed or rebuild in addition to the construction of 12,5 km of noise-reducing walls, 6 purification basins for rainwater and 5 PWC constructions.

 

Facts and figures:

  • Project term: 30 years
  • Concession line: 60 km
  • Start of maintenance: 2009
  • Total concession volume: 850 Million Euro
  • Six-lane expansion: length 41,5 km
  • Contractual end of construction: 15th of January 2012
  • Planned traffic release: end of 2013
  • Pure construction costs: 350 Million Euro

 

Contact

Alexander Strutzke
Alexander Strutzke
Dipl.-Geogr.
Dipl.-Betriebswirt (FH)
Sales and Marketing Manager
phone: +49 (931) 35503-550

Successful project collaboration with EPLASS:

As already used for the successful PPP projects “A4 Hoerselberge” and “A8 Augsburg-Munich”, this project too has chosen EPLASS Professional to manage their construction design review processes.

Various workflows have been defined to enable project participants to review drawings and other documents without the delay of a manual distribution. The process management was optimized through the simultaneous review process of drawings and the utmost flexibility of the workflows.

Each of the parties, from the concession provider (Freiburg Regional Council on behalf of the Federal Republic of Germany) through the concession holder “Via Solutions Südwest” through to the construction consortium is receiving its tasks automatically via EPLASS workflows.

Furthermore all review durations and their adherence to the expected due dates are being monitored through the integrated time-scheduling management function of the EPLASS Professional module.